日韩AV高清在线,亚洲AV无码永久精品,熟女宗合网,男人操女人视频网站

濟(jì)南富強(qiáng)門業(yè)有限公司網(wǎng)站 在線留言 聯(lián)系我們

服務(wù)咨詢熱線

151 6888 2846

熱門關(guān)鍵詞: 水晶折疊門 水晶卷簾門 抗風(fēng)卷簾門

公司新聞

首頁>>新聞資訊>>公司新聞保證卷簾門安裝質(zhì)量方式
聯(lián)系我們
濟(jì)南富強(qiáng)門業(yè)有限公司

聯(lián)系人:林經(jīng)理

電話:151 6888 2846

郵箱:527800164@qq.com

地址:濟(jì)南市歷下區(qū)化纖廠路8號(hào)3號(hào)樓101號(hào)

保證卷簾門安裝質(zhì)量方式

來源:http://m.ifxf.cn 日期:2021-12-06 發(fā)布人:
卷簾門施工工藝程序
Construction process procedure of rolling shutter door
(1)手動(dòng)卷簾門工藝程序:定位、放線一安裝卷筒一安裝手動(dòng)機(jī)構(gòu)一簾板與卷筒連接一安裝導(dǎo)軌一試運(yùn)轉(zhuǎn)一安裝防護(hù)罩。
(1) Process procedure of manual rolling shutter door: positioning and setting out - Installation of drum - Installation of manual mechanism - connection between curtain plate and drum - Installation of guide rail - Test Run - Installation of protective cover.
(2)電動(dòng)卷簾門工藝程序:定位、放線_安裝卷簡一安裝電機(jī)、減速器一安裝電氣控制系統(tǒng)一空載試車一簾板與卷筒連接_安裝導(dǎo)軌一安裝水幕噴啉系統(tǒng)一試運(yùn)轉(zhuǎn)一安裝防護(hù)罩。
(2) Process procedure of electric rolling shutter door: positioning and setting out_ Installation of winding sheet - Installation of motor and reducer - Installation of electrical control system - no-load commissioning - connection between curtain plate and winding drum_ Install the guide rail, install the water curtain spraying system, test run and install the protective cover.
2.定位放線卷簾門安裝方式有洞內(nèi)安裝、洞外安裝、洞中安裝三種。即卷簾門裝在門洞內(nèi),簾片向內(nèi)側(cè)卷起;卷簾門裝在門洞外,簾片向外卷起和卷簾門裝在門洞中,簾片可向外側(cè)或向內(nèi)側(cè)卷起。因此,定位放線時(shí)應(yīng)根據(jù)設(shè)計(jì)要求彈出兩導(dǎo)軌垂直線及卷簡線并測量洞口標(biāo)高。定位放線后,應(yīng)檢查實(shí)際預(yù)埋鐵件的數(shù)量、位置與圖紙核對(duì),如不符合產(chǎn)品說明書的要求,應(yīng)進(jìn)行處理。
2. There are three installation modes of positioning and setting out roller shutter door: installation inside the tunnel, installation outside the tunnel and installation in the tunnel. That is, the rolling shutter door is installed in the door opening, and the curtain sheet is rolled up to the inside; The rolling shutter door is installed outside the door opening, the curtain sheet is rolled outward, and the rolling shutter door is installed in the door opening, and the curtain sheet can be rolled outward or inward. Therefore, during positioning and setting out, the vertical lines of the two guide rails and the winding center line shall be snapped according to the design requirements, and the elevation of the opening shall be measured. After positioning and setting out, the quantity and position of the actual embedded iron parts shall be checked and checked with the drawings. If they do not meet the requirements of the product manual, they shall be handled.
濟(jì)南卷簾門
3.安裝卷筒安裝卷筒時(shí),應(yīng)使卷筒軸保持水平,并使卷筒與導(dǎo)軌之間距離兩端保持一致,卷筒臨時(shí)固定后進(jìn)行檢查,調(diào)整、校正合格后,與支架預(yù)埋鐵件用電焊焊牢。卷筒安裝后應(yīng)轉(zhuǎn)動(dòng)靈活。
3. Install the drum. When installing the drum, keep the drum shaft horizontal and keep the distance between the drum and the guide rail consistent at both ends. After the drum is temporarily fixed, check it. After adjustment and correction are qualified, weld it firmly with the embedded iron parts of the support by electric welding. The drum shall rotate flexibly after installation.
4.簾板安裝簾板事先裝配好,再安裝在卷筒上。門簾板有正反向,安裝時(shí)要注意,不得裝反。
4. Curtain plate installation the curtain plate shall be assembled in advance and then installed on the drum. The door curtain plate has positive and negative directions. Attention shall be paid during installation, and it shall not be installed reversely.
5.安裝導(dǎo)軌按圖紙規(guī)定位置線找直、吊正軌道,保證軌道槽口尺寸準(zhǔn)確,上下一致,使導(dǎo)軌在同一垂直平面上,然后用連接件與墻體上的預(yù)埋鐵件焊牢。
5. Install the guide rail, align and hang the rail according to the position line specified in the drawing, ensure that the size of the rail notch is accurate and consistent up and down, make the guide rail on the same vertical plane, and then weld it firmly with the embedded iron parts on the wall with connectors.
6.安裝水幕噴淋系統(tǒng)防火卷簾門應(yīng)安裝水幕噴淋系統(tǒng)。水幕噴淋系統(tǒng),應(yīng)與總控制系統(tǒng)連接。安裝后,應(yīng)試驗(yàn)。
6. Install the water curtain spraying system. The fireproof rolling shutter door shall be installed with the water curtain spraying system. The water curtain spray system shall be connected with the main control system. After installation, the test shall be carried out.
7.試運(yùn)轉(zhuǎn)先手動(dòng)試運(yùn)行,再用電動(dòng)機(jī)啟閉數(shù)次,調(diào)整無卡住、阻滯及異常噪聲等現(xiàn)象為合格。
7. The test run shall be conducted manually first, and then the motor shall be opened and closed for several times. It is qualified if there is no jamming, block and abnormal noise.
8.安裝卷筒防護(hù)罩
8. Install the drum guard
以上的精彩內(nèi)容就是小編今天為您提供的內(nèi)容,更多的精彩內(nèi)容來自: 濟(jì)南卷簾門詳情請(qǐng)點(diǎn)擊我們的網(wǎng)站關(guān)注:http://m.ifxf.cn
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from Jinan roller shutter door. For details, please click our website to pay attention to: http://m.ifxf.cn

閱讀/ Recommended reading

  如果您遇到了卷簾門鎖住的情況,這里有一些可能的解鎖方法:  If you encounter a situation where the rolling shutter doo...

濟(jì)南卷簾門:斷掉一片后的處理方法,你學(xué)會(huì)了嗎? 2024-11-19
如何延長卷閘門的壽命 2024-11-06
重視卷簾門門口堆物問題 2024-11-06
快速卷簾門介紹與快速卷簾門材料說明 2024-10-26
濟(jì)南卷簾門廠:卷簾門安裝施工工藝詳解 2024-10-14
濟(jì)南卷簾門安裝秘籍,讓家居更有面子 2024-09-21
濟(jì)南遙控卷簾門:我來教你——卷閘門遙控器遇到故障怎么辦? 2024-08-28
濟(jì)南卷簾門:卷簾門(不銹鋼款) 2024-07-25
最近免费中文字幕大全高清大全10 | 欧美成人精精品一区二区三区| 四虎影院sm| 日本工口h视频| 四虎最新播放| 中文字幕一区二区在线观看| 黄色三级片在线| 性色一区av| 九九九久久性爱视频| 欧美日韩中文精品天堂| 狠狠爱五月丁香亚洲综合| 日韩综合激情| 精品国产伊人| 中文字幕三区第二页| 七七88色| 亚洲AV色区一区二区三区| 激情图片久久| 欧美精品亚洲精品j| 一区二区中文字幕网| 蜜桃a| 无码精品久久久久久人妻中字| 无码6区| 日本肏屄大篇网站| 国产。欧美。日韩| xxxxxn亚洲| 精品一区二区三卡四卡网站| 色呦呦网| 国产后入自拍| 波多野吉衣57分钟| 国内乱伦123| 亚洲中文久久精品无码99| 尹人成人| www.趴趴趴.av| 平青草伦理| 超碰在线97se| 精品国产AV色一区二区深夜久久| 国产在线xxx| 加勒比东京热成人AV| 中文字幕黄视频| 西西色网站| 91成人精品|